Dobrotvorskaya TPP

Results:

Point Cloud Report with Volume Calculation Orthophoto Digital Elevation Model

Technology:

LiDAR Post-processing scans Modeling and 2D Documentation

Time devoted to the project:

Fieldwork — 3 hours Post-processing — 1 day Total time — 2 days
Dobrotvorskaya TPP

Project objective

Conduct an inventory of the coal warehouse of the thermal power plant.

About the object

Dobrotvorskaya TPP runs an average of 2.0-4.0 thousand tons of coal per day. The first turbine generator was put into operation on December 15, 1955. The station is connected by power transmission lines to the western regions of Ukraine and the Polish Republic.

Work results

Dobrotvorsk TES

Orthophoto

Dobrotvorsk TES

Point Cloud

Digital Elevation Model