Dymerska Solar Power Plant

Results:

Orthophotoplan Thermal survey report

Technology:

LiDAR Термальная инспекция Лидар Thermal Inspection

Time devoted to the project:

Field work — 1 day Post-processing — 3 days Total time — 4 days
Dymerska Solar Power Plant

Project objective

Preventive inspection to detect malfunctions on the panels.

About the object

The first project of a Spanish energy giant on the Ukrainian market was the Dymerskaya SES in the Kiyv region with a total peak capacity of 57.6 MW. The first stage of this power plant was commissioned by UDP Renewables in 2017.

Work results

Photo of the panel

Thermal photo of the panel with the defective element

Orthophotoplan